Three options for transplanter field operations

Scenario 1: When encountering irregular blocks, machine plugging operations, the longest position of the field is used as the first line to operate first, a job width is reserved around the field in sequence, and then the operation is completed after the operation is completed. . Option 2: When the machine inserts a job width around the sky, the Shuntian block works in the direction of the length, and finally leaves the field after finishing the work around the field. Solution 3: The first line of the transplanting operation is directly tied to the side of the field, and the other three sides are set aside by the field to reserve two empty fields for the width of the operation, so that the rice transplanter can make a rounding turn, and then quit the field after reciprocating the three sides. Piece. This kind of scheme is mostly used for a ride-type rice transplanter with a large turning radius.

                                                                    Concealed Mural Bed Head Unit

   Integraged design, embedded installation, case and base can be separated freely,easy to install and maintenance.

   Used concealed mural quiet industrial load slide rail,mural movemnet is flexible and free, beautiful and generous.


   The installation panel is seamless and adopts aluminum alloy anodized wire drawing technology. The mural pattern can be customized according to customer requirements.


Concealed Mural Bed Head Unit

Bed Head Panel System,Concealed Mural Bed Head Unit,Bed Head Unit With Gas Outlet,Bed Head Unit Factory

Hunan Eter Electronic Medical Project Stock Co., Ltd. , https://www.centralgas.be